Select Page

Step 1. Place your order

Fill in the order form and provide all details of your assignment.

Step 2. Make Payment

Choose the payment system that suits you most.

Step 3. Receive your paper

Once your paper is ready, we will email it to you.

Instructions: Use the Work Breakdown Template with the attached file of renovat

by | Aug 29, 2022 | Project Management | 0 comments

Get Help With Your Essay

"Place your order now for a similar assignment and have exceptional work written by our team of experts, guaranteeing you A results."

For This or a Similar Paper Click To Order Now

 

Instructions: Use the Work Breakdown Template with the attached file of renovation on a millionaires home.
In Module 1 you chose a project and completed a Project Charter. (File Attached) Now you will develop a Work Breakdown Structure (WBS) for that project with four to five (4-5) high level tasks and an average of four to five (4-5) sub-tasks for each high level task.
You must have a minimum of 20 tasks. Note: It is not necessary to have an equal number of sub-tasks for each high level task, but you are required to have a minimum of 20 tasks in total.
1) Download and save the WBS Template. The template has two tabs – one for the Graphical WBS and one for the WBS Dictionary. Note: You may use a design of your own choosing, but it must contain both the Graphical WBS and the WBS Dictionary.
2)On the Graphical WBS tab, enter the identified high level tasks and sub-tasks. Be sure to include:
Task Name
WBS Code
3)On the WBS Dictionary tab, based on your identified tasks, create your WBS Dictionary. Be sure to include:
Level
WBS Code
Task Name
Definition

For This or a Similar Paper Click To Order Now